Tell us what you're planning. We'll come look at the panel, the load, and the run. Then hand you a quote you can hold us to.

We are a licensed electrical contractor, not a handyman service. Every job gets a permit, an inspection, and a written scope before anyone opens a wall.
We look at the panel, the load, and what you are planning next. Takes about thirty minutes.
Flat price, itemized, in writing. Nothing starts until you have approved it.
We pull the permit and book the inspection. You do not touch the paperwork.
Work completed, site cleaned, inspection passed, documentation handed over.
The reason most upgrades get delayed is that nothing looks wrong until you try to add something. Here is the difference in plain terms.
Most Austin homes built before 1990 are still on 100 amp service. If you are planning an EV, a remodel, or solar in the next few years, the panel is the first thing to solve, not the last.
Most electricians will not put a number on a website. These are real starting points so you can budget before you ever pick up the phone.
Final price comes from the walkthrough, because every panel and every run is different. The number you approve is the number you pay.

They quoted the panel upgrade flat, pulled the permit, and passed inspection on the first try. Boring, in the best possible way.
"Gave us a flat quote up front and stuck to it. No surprise line items when the invoice came."
"Rewired our 1970s house over two days and explained every step before touching a wall."
"Told me I did not need the full upgrade yet and sized the charger to what I already had."
Based in Austin, dispatching across the surrounding metro. If you are just outside the list, call and ask.